Testing method for efficiency value of PR system in photovoltaic power station

瀏覽數:1,095 發布于:2024-12-26

? Testing method for efficiency value of PR system in photovoltaic power station

The Performance Ratio (PR) of a photovoltaic power station is one of the important indicators for measuring the power generation efficiency of a photovoltaic power station, and its calculation formula is:
PR=(actual power generation ÷ installed capacity of power station) ÷ (theoretical power generation ÷ installed capacity of power station)

Among them, the actual power generation refers to the actual power generation of the power station within a certain period of time, and the theoretical power generation refers to the total amount of power that the power station should generate under standard testing conditions during that period of time.

Therefore, to test the PR value of a photovoltaic power plant, the following steps are usually required:
1. Installation of monitoring equipment: Install monitoring equipment in the power station, such as solar irradiance meters, thermometers, and ammeters, to monitor the output power, environmental factors, and meteorological conditions of the power station in real time.

2. Data collection: Over a period of time, based on the data collected by the equipment, record parameters such as the output power of the power station, solar irradiance per unit area of the power station, module temperature, and tilt angle.

3. Calculate theoretical power generation: Based on the technical parameters of photovoltaic modules, local solar irradiance, and environmental temperature, calculate the total amount of power that the photovoltaic power station should generate under standard testing conditions.

4. Calculate actual power generation: Based on real-time monitoring data, calculate the actual power generation of the power station within a certain period of time.

5. Calculate PR value: Compare the actual power generation with the theoretical power generation to calculate the PR value of the power station.

When testing PR values, the following points should be noted:
1.During testing, typical sunny periods should be selected to ensure the reliability of the test results.

2.During the testing process, the accuracy of the radiometer and thermometer should be maintained to ensure the precision of the test data.

3. Conduct multiple repeated tests on the test results to ensure their credibility and accuracy.

4.To ensure the consistency of test data, the stability of test conditions should be ensured, such as test timing and testing equipment.

The LAILX PR tester can measure the power and conversion efficiency of photovoltaic power plants at the inverter, with higher accuracy compared to traditional irradiance testing.

關于我們

產品展示

新聞資訊

聯系我們

WeChat

LINE

ICP備案/許可證號:蘇ICP備17006210號,Lailx New Energy Technology Co., Ltd

 

 

主站蜘蛛池模板: 波多野结衣在线免费观看视频 | 大学生美女穿黑色丝袜网站 | 一级做a爱片特黄在线观看 一级做a爱片就在线看 | 高h浪诱受肉耽文 | 欧美激情一区二区三区不卡 | 亚洲国产欧美日韩一区二区三区 | h成年日本漫画网站免费 | 一个人在线看的免费视频 | 欧美日韩在线不卡 | 免费青青草| 很黄很污的视频网站 | 午夜看毛片 | 最近中文字幕2019视频1 | 大胸美女被强吻胸动态图片 | 男人和女人日皮视频 | 欧美精品福利 | 国产极品粉嫩 | 国产一区精品在线 | 国产成人激情视频 | 亚洲一区日韩二区欧美三区 | 一级毛片在线免费视频 | 国产亚洲欧美日韩综合另类 | 欧美激情在线播放一区二区三区 | 亚洲性爰视频 | fc2在线亚洲一区 | 天天噜天天干 | 亚欧精品 | 国产成人午夜精品影院游乐网 | 青青在线视频 | 一级毛片免费高清视频 | 欧美日韩高清不卡一区二区三区 | 国产成人精品日本亚洲语音2 | 老司机午夜视频在线观看 | 一级片视频免费 | 午夜色大片| 国产精品视频一区二区三区不卡 | 日韩黄在线观看免费视频 | 大桥未久aⅴ一区二区 | 9966国产精品视频 | 动漫精品专区一区二区三区不卡 | 窝窝视频成人影院午夜在线 |